蔡厝港地铁/轻轨站
蔡厝港地铁/輕軌站(英語:Choa Chu Kang MRT/LRT Station,车站代号NS4/BP1)是新加坡地铁南北线和轻轨武吉班让线的高架转换站,位于新加坡本岛蔡厝港规划区。该站附近设有蔡厝港巴士转换站,其他设施有第一乐广场、吉丰社区中心及蔡厝港公园。
NS4 JS1 BP1 蔡厝港 Choa Chu Kang சுவா சூ காங் Choa Chu Kang | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
位置 | 新加坡蔡厝港4道10號(地鐵)、15號(輕軌) | |||||||||||||||||||||||||
地理坐标 | 1°23′06″N 103°44′40″E / 1.385092°N 103.744322°E | |||||||||||||||||||||||||
车站类别 | 地鐵站 / 輕軌站 | |||||||||||||||||||||||||
运营者 | SMRT輕軌(SMRT集團) SMRT地鐵(SMRT集團) | |||||||||||||||||||||||||
途经线路 | 南北線、裕廊區域線(興建中)、武吉班讓輕軌 | |||||||||||||||||||||||||
换乘交通 | 巴士、德士 | |||||||||||||||||||||||||
车站构造 | ||||||||||||||||||||||||||
站体类型 | 架空 | |||||||||||||||||||||||||
车站层数 | 2層 | |||||||||||||||||||||||||
停车设施 | 有(第一乐广场) | |||||||||||||||||||||||||
无障碍车站 | 有 | |||||||||||||||||||||||||
站台 | 島式(地鐵) 西班牙式(輕軌) 岛式(裕廊區域線,兴建中) | |||||||||||||||||||||||||
股道 | 4條(2條地鐵、2條輕軌) 6条(4條地鐵、2條輕軌)(未来) | |||||||||||||||||||||||||
其他信息 | ||||||||||||||||||||||||||
车站代码 | NS4 JS1 BP1 | |||||||||||||||||||||||||
历史 | ||||||||||||||||||||||||||
启用日期 | 1990年3月10日地铁支线) 1996年2月10日 (并入南北线) 1999年11月6日 (武吉班让轻轨1、2号站台) 2016年12月27日 (武吉班让轻轨3、4号站台) | (|||||||||||||||||||||||||
预计启用时间 | 2027年 | (裕廊区域线站台)|||||||||||||||||||||||||
电气化 | 是 | |||||||||||||||||||||||||
旧称 | 武吉班让站 | |||||||||||||||||||||||||
邻近车站 | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
|
车站兴建时工程名为武吉班让。该站是新加坡早期地铁系统中第二期规划的一部分,于1990年3月建成启用。1996年后,南北线由兀兰站延伸至此,该站接入南北线。1999年11月轻轨站台投入运营。
2012年,蔡厝港站迎来改造,项目包括南北线站台的半高安全门的安装。2015年,武吉班让轻轨站台也安装了安全栏杆。2016年12月,轻轨线车站又在原有岛式站台的两侧新增了侧式站台,同时加宽地铁轻轨之间换乘楼梯以优化换乘客流。在2018年5月发布的未来规划中,裕廊区域线一期在此设站并于2027年起运营,该站届时将成为一个三线换乘站。
历史
编辑地铁南北线
编辑1983年10月的早期新加坡地铁规划中,该站命名为武吉班让站[1][2]。该站在1990年完工,比原定时间提前两年[3][4]。
1986年1月,总价达9980万新加坡元的武吉班让站工程确定由荣民工程与福联盛两家公司共同承包。除武吉班让站外,该工程还包括武吉巴督与武吉甘柏两站及6公里的沿途高架[5][6]。1987年3月,该站更名为蔡厝港站[7]。
武吉甘柏站与蔡厝港站间的最后一部分高架桥梁体于1988年1月9日安装到位[8]。1990年3月10日,新加坡地铁支线开通,蔡厝港站成为当时支线的终点站投入运营[9]。1996年2月10日,该站并入兀兰延长线,成为南北线的一部分[10][11]。
武吉班让轻轨
编辑1994年12月,时任新加坡通讯部(现交通部)部长马宝山公布轻轨试点规划,旨在“扩大地铁服务范围及通达程度”。其中蔡厝港站将成为南北线与武吉班让轻轨的换乘站[12]。1996年12月,新加坡总理吴作栋宣布武吉班让轻轨将在三年内完工,预计投入3亿新加坡元[10][13]。
全长8公里的轻轨设计及建造由吉宝企业、金门建筑、Adtranz三家公司共同完成,合同金额2.85亿新加坡元[14][15][16]。1999年11月6日,武吉班让轻轨蔡厝港站对外运营[17][18][19]。
升级改造
编辑2012年10月31日,陆路交通管理局提出轻轨蔡厝港站增设两个侧式站台的计划,以缓解轻轨线站台的拥挤状况。该提升改造计划还包括加宽连接两线站台的换乘通道阶梯、置换新式闸机、新增通往第一乐广场的通道[20][21][22]。轻轨站新增的侧式站台于2016年12月27日投入运营[23][24]。
2012年,作为地铁系统车站安全提升工程的一部分,陆路交通管理局在南北线站台引进半高安全门[25][26][27]。2012—2013年间,车站安装了大型工业节能风扇,此举改善了高架站台的通风[28]。
2015年,轻轨站台安装安全栏杆。蔡厝港站,以及轻轨与滨海市区线的换乘站武吉班让站因承载通勤客流较大,优先安装这一设施,以防止旅客横穿轨道或坠轨[29]。与地铁安装的半高安全门不同,安全栏杆不能伸缩开关,只预留列车上下客的开口。2018年,轻轨站台也装上了新式风扇[30]。
裕廊区域线
编辑2018年5月9日由陆路交通管理局发布的规划中,蔡厝港站将可换乘全长24公里的裕廊区域线[31]。裕廊区域线一期由蔡厝港站始,至峇哈路口站分为两条支线去往大华士站与文礼站。一期工程预计于2026年完工[32][33][34]。但受2019冠状病毒病疫情的影响,工程将延期至2027年完工[35]。
该线沿途各站及高架的设计与承建方为上海隧道股份有限公司(新加坡)[36],澳昱冠公司任工程首席顾问[37]。工程总价4.652新加坡元[36]。工程亦包括蔡厝港西站与登加站,以及该区间3.4公里的轨道设计施工[38][39][40]。
由于裕廊区域线工程需要,蔡厝港巴士转换站在施工期间迁至蔡厝港环道与蔡厝港道的交叉口。原址旁的一栋多层立体停车楼亦于2020年10月拆除[41][42]。
概要
编辑蔡厝港站车站代号NS4/BP1,是地铁南北线(NSL)的途径站(邻近站点为武吉甘柏站及油地站)、武吉班让轻轨(BPLRT)的终点站(邻近站点南景站)[43]。蔡厝港站是新加坡早期地铁系统中地铁武吉线的终点站,该线作为东西线的支线联通蔡厝港站至裕廊东站[44]。后该支线并入南北线[11]。未来该站还成为裕廊区域线的终点站(邻近站点蔡厝港西站)[45]。
南北线站台上覆倒“V”型坡顶[46][47],并采用红砖墙以与周边组屋建筑风格相称[48]。同多数地铁车站相同,南北线为岛式站台设计[49]。而轻轨线站台则为西班牙式站台[21]。兴建中的裕廊区域线站体将达139米长、30米宽[50]。
车站坐落于蔡厝港4道及蔡厝港环道的交叉口上[51]。该站服务于蔡厝港一带组屋,同时还可去往蔡厝港巴士转换站(临时)、第一乐广场、蔡厝港社区中心、吉丰社区中心、蔡厝港公园、南山小学等设施[52]。
车站结构
编辑L2 | 武吉班让轻轨站台 |
| |||||||||||||||||||
南北线站台 |
| ||||||||||||||||||||
閣樓 | 轉換層 | 南北線站台及武吉班讓輕軌站台轉換區 | |||||||||||||||||||
L1 | 大廳 | 檢票口、自動售票機、車站控制室、Choa Chu Kang Xchange、第一樂廣場、蔡厝港巴士轉換站 |
时刻表
编辑終站(地鐵) 站台(輕軌) |
首班車 | 末班車 | ||||
---|---|---|---|---|---|---|
一-六 | 星期日及 公定假日 |
每日 | ||||
南北線 | ||||||
往 NS1 裕廊東 | 5.39am | 6.02am | 12.53am | |||
往 NS28 濱海南碼頭 | 5.25am | 5.44am | 10.56pm | |||
往 NS19 大巴窯 | – | – | 11.38pm | |||
往 NS16 宏茂橋 | – | – | 12.27am | |||
武吉班讓輕軌 | ||||||
站台1 | 5.13am | 5.32am | 11.30am | |||
站台2 | 5.13am | 5.32am | 11.30am |
图库
编辑-
地铁南北线蔡厝港站站台
-
武吉班让轻轨的“一岛两侧”西班牙式站台,图中最右侧的侧式站台仅供下客
-
建设中的裕廊区域线蔡厝港站,2021年2月
-
蔡厝港站A出入口
参考文献
编辑- ^ Phase 2 Gets Go-ahead to Ensure Continuity. The Straits Times. 26 October 1983: 8 [1 June 2024] –通过NewspaperSG.
- ^ The South and West Lines. The Straits Times. 28 October 1983: 9 [1 June 2024] –通过NewspaperSG.
- ^ Work on Second Phase of MRT System Ahead of Schedule. The Business Times. 13 November 1984: 1 [1 June 2024] –通过NewspaperSG.
- ^ Dhaliwal, Rav. Earlier Target Date for Phase II MRT. The Straits Times. 13 November 1984: 48 [1 June 2024] –通过NewspaperSG.
- ^ Firm Gets MRT Job on Seventh Try. The Straits Times. 7 January 1986: 11 –通过NewspaperSG.
- ^ Taiwanese-local Venture Wins $100m MRT Contract. The Business Times. 7 January 1986: 2 [1 June 2024] –通过NewspaperSG.
- ^ Dhaliwal, Rav. Five MRT Stations Renamed to Better Reflect the Locality. The Straits Times. 27 March 1987: 19 [1 June 2024] –通过NewspaperSG.
- ^ Last Viaduct Beam for MRT Phase 2B Now in Place. The Straits Times. 10 January 1988: 16 [1 June 2024] –通过NewspaperSG.
- ^ MRT to Bt Batok, Bt Gombak and Choa Chu Kang on Mar 10. The Straits Times. 14 February 1990: 3 [1 June 2024] –通过NewspaperSG.
- ^ 10.0 10.1 Speech By Prime Minister Goh Chok Tong At the Opening of Woodlands MRT Line on Saturday, 10 February 1996 At 10.00 Am (PDF). National Archives of Singapore. 10 February 1996. (原始内容存档 (PDF)于14 July 2019).
- ^ 11.0 11.1 Crowds Came from as Far as Hougang and Jurong. The Straits Times. 11 February 1996: 19 [1 June 2024] –通过NewspaperSG.
- ^ Leong, Chan Teik. Green Light for Light Rail System. The Straits Times. 4 December 1994: 1 [1 June 2024].
- ^ Leong, Chan Teik. Bukit Panjang to Get S'pore's First Light Rail Train. The Straits Times. 11 February 1996: 1 [1 June 2024].
- ^ Speech By Mr Mah Bow Tan, Minister for Communications, At the Signing Ceremony for the Bukit Panjang Light Rapid Transit (LRT) Project At the Raffles City Central Atrium on Friday, 12 April 1996 At 9.00 Am. (PDF). National Archives of Singapore. 12 April 1996 [1 June 2024].
- ^ Leong, Chan Teik. $285 M Contract for LRT System Signed. The Straits Times. 13 April 1996: 1 [1 June 2024].
- ^ Tan, Christopher. Keppel-led Group Wins LRT Contract. The Business Times. 13 April 1996: 3 [1 June 2024] –通过NewspaperSG.
- ^ Kaur, Karamjit. Bukit Panjang LRT to Begin Operating on Nov 6. The Straits Times. 26 July 1999: 3.
- ^ Yeo, Geraldine. LRT a Hit on Very First Day. The Straits Times. 7 November 1999: 1 [1 June 2024].
- ^ Speech By Dr Tony Tan, Deputy Prime Minister And Minister For Defence, At The Official Launch Of The Bukit Panjang LRT System, Sat 6 Nov 99, 10am. National Archives of Singapore. 6 November 1999 [19 October 2020].
- ^ Two-car Train System for Sengkang & Punggol LRT. Channel NewsAsia. 3 November 2012 [21 September 2019]. (原始内容存档于3 November 2012).
- ^ 21.0 21.1 Annex: Additional Platforms At Choa Chu Kang LRT Station (PDF). Land Transport Authority. [30 May 2024]. (原始内容 (PDF)存档于24 October 2013).
- ^ 2-car System for Sengkang Punggol LRT by 2016; Improvements to Choa Chu Kang LRT Station. Land Transport Authority. 11 July 2020 [30 May 2024]. (原始内容存档于15 May 2020).
- ^ Lim, Adrian. New Platforms At Choa Chu Kang LRT Station to Ease Congestion. The Straits Times. 23 December 2016 [29 December 2019].
- ^ Two New Platforms At Choa Chu Kang LRT Station Completed. Land Transport Authority. 30 March 2021 [30 May 2024]. (原始内容存档于16 May 2020).
- ^ Platform Screen Doors for All Above-ground MRT Stations By 2012. The Straits Times. 25 January 2008. (原始内容存档于28 January 2008).
- ^ Speech By Mr Raymond Lim, Minister for Transport, At the Visit to Kim Chuan Depot, 25 January 2008, 9.00am. Ministry of Transport (新闻稿). 25 January 2008 [11 January 2015]. (原始内容存档于12 January 2015).
- ^ LTA Completes Installing Elevated MRT Station Screen Doors Early. Channel NewsAsia. [23 September 2017]. (原始内容存档于24 September 2017) (美国英语).
- ^ Enhancing Connectivity and Comfort for Commuters. Land Transport Authority. 13 October 2011 [6 July 2012]. (原始内容存档于25 December 2012).
- ^ Tan, Christopher. Platform Barriers At All LRT Stations By 2018 to Prevent Falls. The Straits Times. 21 October 2015 [11 May 2020]. (原始内容存档于1 January 2020).
- ^ Lim, Adrian. LTA Taps Auto Fare Gates as Way to Go. The Straits Times. 9 December 2015 [30 May 2024].
- ^ Lim, Adrian. New Jurong Region Line to Boost Access for NTU Students. The Straits Times. 9 May 2018 [9 April 2021]. (原始内容存档于9 April 2021).
- ^ News Room – News Releases – Joint News Release By the Land Transport Authority (LTA) & SLA – Jurong Region Line: Enhancing Connectivity in the West. Land Transport Authority. 9 April 2021 [9 April 2021]. (原始内容存档于9 April 2021).
- ^ Jurong Region Line to Serve NTU, Tengah Estate, Jurong Industrial Estate. Channel NewsAsia. Mediacorp. 9 May 2018 [21 September 2019]. (原始内容存档于21 September 2019).
- ^ Lim, Adrian. Jurong Region Line, Singapore's 7th MRT Line, to Open in Three Phases from 2026. The Straits Times. 9 May 2018 [29 July 2022]. (原始内容存档于27 May 2018).
- ^ Written Reply By Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line. Ministry of Transport. 1 February 2021 [24 March 2021]. (原始内容存档于9 April 2021) (英语).
- ^ 36.0 36.1 Yong, Clement. Construction for first 5 stations on Jurong Region Line slated to start in 2020, end in 2026. The Straits Times. 10 September 2019 [30 May 2024].
- ^ Jurong Region Line Contract J102, Singapore. Aurecon. [1 June 2024].
- ^ LTA Awards Civil Contracts to Construct Five Stations for the Jurong Region Line. Land Transport Authority. 21 September 2019 [21 September 2019]. (原始内容存档于21 September 2019).
- ^ Tender Information. Land Transport Authority. 21 September 2019 [21 September 2019]. (原始内容存档于21 September 2019).
- ^ LTA JRL J102. STECS. [2 June 2024].
- ^ Wong, Pei Ting. HDB multi-storey car park with shops to make way for construction of Jurong Region Line. Today. 9 May 2018 [22 June 2024].
- ^ Koh, Esther. With the new Jurong Region MRT Line, a tight-knit community makes way for change. The Straits Times. 23 May 2018 [30 May 2024].
- ^ MRT System Map (PDF). Land Transport Authority. [1 June 2024]. (原始内容存档 (PDF)于21 August 2020).
- ^ Residents Get Special 'shuttle Service' with Bukit MRT Line. The Straits Times (Singapore Press Holdings). 11 March 1990: 15 [1 June 2024] –通过NewspaperSG.
- ^ Future System Map (PDF). LTA. [9 September 2020]. (原始内容 (PDF)存档于9 September 2020).
- ^ MRT Station Roofs to Show Singapore's Cultural Mix. The Straits Times. 13 April 1987: 13 [1 June 2024] –通过NewspaperSG.
- ^ Dhaliwal, Rav. Ethnic Touch for MRT Stations. The Straits Times. 16 September 1985: 24 –通过NewspaperSG.
- ^ Scenic Ride on Bukit Gombak Line. The Straits Times. 3 March 1990: 21 [1 June 2024] –通过NewspaperSG.
- ^ Dhaliwal, Rav. Getting to Know the Network and How It Will Work. The Straits Times (Singapore Press Holdings). 28 April 1987: 19 [19 December 2020] –通过NewspaperSG.
- ^ Contract J102 (Infographic poster at JRL Project Information Centre). Singapore: Land Transport Authority. 2020 [1 June 2024]. (原始内容存档于1 June 2024).
- ^ Choa Chu Kang – Map. SMRT Journeys. SMRT Corporation. [1 June 2024]. (原始内容存档于7 October 2022).
- ^ Choa Chu Kang – Exits. SMRT Journeys. SMRT Corporation. [1 June 2024]. (原始内容存档于1 May 2022).
外部链接
编辑